In an energy-sharing operation, the allocation key is the calculation rule, expressed as percentages, that attributes to each consumer member a share of the energy injected by the producers. There is nothing physical about it: the distribution system operator (DSO) applies it quarter-hour by quarter-hour to the smart-meter readings. Only one key applies per sharing operation, and it decides only the kWh: what they are worth in euros is a matter for the internal transfer price, set separately in the same agreement.

Belgium has three frameworks, and our comparison of the three regions details what each one allows:

  • Wallonia: three standard keys published by CWaPE — egalitarian fixed, specific fixed, consumption-based dynamic — which DSOs accept automatically; any other key must be authorised by CWaPE.
  • Brussels: three methods operated by Sibelga and set by BRUGEL — fixed (single-round or multi-round), prorata, hybrid — which can be changed at any time at the request of the single point of contact.
  • Flanders: no list of “standard” keys published by VREG; the Fluvius protocol, the authoritative source, supports three verdeelsleutels: vaste, relatieve and optimale.

Behind these three vocabularies, the same two families recur everywhere: fixed keys, egalitarian or weighted by members’ contributions, and dynamic or optimised keys, which follow actual consumption. Choosing between them is not a technical question but a governance choice: equality between members, recognition of investment, or maximising collective self-consumption. The diversity of profiles matters too — as soon as a school or an SME joins the group, strict equality stops being optimal — as does the financial predictability members expect. Finally, all three regions allow a key to be modified after launch: it is wise to plan an annual review at the general assembly from the outset.

It remains to test these principles against your own profiles, because the same key can recover 70% of the available production in one community and barely 50% in another. OptimCE offers two features for this, both fed by a CSV of your production and consumption data. Automatic generation proposes a candidate key, either by scanning your region’s standard keys (brute force) or with the LOGAAS algorithm, whose non-standard key must, in Wallonia, go through the CWaPE authorisation route. Simulation replays a key you have chosen and returns its self-consumption, surplus, self-sufficiency and sharing rate, without touching the key applied by the grid operator. Neither one submits a key to the DSO: the amendment, the signatures and the submission stay in your hands. The full workflow is presented on the page for the allocation key tool.

The guides below follow the same order: first the three regional frameworks, then generating and simulating a key on your data.

Understanding the key and what each region accepts

  • Allocation key in Belgium: the 3 regions

    Key types accepted by CWaPE, BRUGEL and VREG, what changes between Wallonia, Brussels and Flanders, and how to choose the right one.

Generating and simulating your key with OptimCE