Grid
Incentive network pricing
The Walloon network tariff structure available from 2026, which varies the proportional term across time bands (ECO, MEDIUM, PIC) to discourage consumption peaks. Optional, reversible, restricted to smart meters — marketed by ORES as the Impact tariff.
Also known as: Impact tariff
Terms used in this definition
In the same category
- Capacity tariff
- Capacity term
- Curtailment
- Dual-rate tariff
- EAN code
- Exclusive-night meter
- Flexibility
- Flexible connection
- Fluvius
- GRD
- GRT
- Injection
- Net deliverable capacity
- Prosumer tariff
- Sibelga
- Supply point
Articles that use this term
- Distribution tariffs in Wallonia: 5 DSOs compared
- Smart meters in Wallonia: the complete guide
- Impact tariff and energy communities
- Home battery: the price and the alternative
- Solar panels: nobody home during the day
- Solar surplus: the 5 options compared
- Solar panels 2026: still worth it in Wallonia?
- Which electricity tariff to choose in Belgium?
- Reduce your electricity bill: Wallonia 2026
- Why your electricity bill stays high in Belgium
- Energy self-consumption in Belgium
Go further
Grid and DSOs: operator, meter and EAN code — Who runs the grid up to your meter, who to call for what, and what a smart meter changes for you.